Load Shedding Time Management System With Programmable Interface

Authors

  • E. C Aneke Author

Keywords:

electric power, load shedding, optimal utilization, power utility

Abstract

Load shedding is an approach employed by power utilities to manage electricity demand during periods of high consumption or insufficient supply. Effective load shedding requires precise scheduling and condition to minimize disruptions and ensure fair distribution of available power. This paper presents an overview of a load- shedding time management system enhanced by a programmable interface, aimed at improving the sufficiency and reliability of load- shedding operations. The proposed system leverages a programmable interface to enables advanced control and automation capabilities. It provides a user friendly interface through which power utilities can define and customize load shedding schedules based on various factors such as geographical areas, customer segments, and energy consumption patterns. The programmable interface allows for the dynamic adjustment of load shedding parameters in response to changing demand conditions, ensuring optimal utilization of available power resources.

Author Biography

  • E. C Aneke

    Caritas University Amoriji Nike Emene, Enugu State

References

AnkitVijayvargiya, Abhishek Bansal, Abhishek Sharma, Aditya Jain, “Effective Load Shedding Technique for Utility Department,” IJEMR, Volume-6, Issue-2, March-April 2016

Data Sheet - Texas Instruments of ULN2003 [online] www.ti.com/lit/ds/symlink/uln2003a.pdf.

Data Sheet - Texas Instruments of ULN2003 Rekha, A,DrRathina Kumar, M., Ashok Kumar, N., Research Article An Intelligent Load Shedding To Improve Power System Congestion published on 13 April 2013. The datasheet of the AT89S52 microcontroller from Atmel [online] is available. www.atmel.com/images/doc0265.pdf

DS1307 - Part Number Search - Maxim datasheets.maximintegrated.com/en/ds/DS1307.pdf. [6] Demand for electricity changes through the days www.eia.gov. [7] Electricity Demand http://www.mpoweruk.com/electricity_demand.htm

Electricity Demand http://www.mpoweruk.com/electricity_ demand.htm [1] Datasheet of 8051 and 8259 Microcontroller from ATMEL, The 8051 Microcontroller and Embedded Systems, Mazidi, 2 Edition, 2007

Indian Power sector, India, accessed 31 Jan 2021

MVP Rao - A Research in Real Time Scheduling Policy for Embedded system-2009 The paper is available at www.clei.org/cleiej/papers/v12i2p4.pdf

MVP Rao - A Research in Real Time SchedulingPolicy for Embedded system-2009 Thepaper is available at www. clei.org/cleiej/papers/v12i2p4.pdf

RajaramVarsha v, KadamAnkita R, SalaviKomal D, KambleShubangi V, “LOAD SHEDDING TIME MANAGEMENT WITH PROGRAMMABLE INTERFACE” IJIERT, Vol 6, Issue 4, Apr. -2019 [5] Shri. S D Dubey, Central Electricity Authority, accessed 31 Jan 2021

SiemberMushtaq, Kiranpreet Kaur, “Design And Analysis of Programmable Interface based Load Shedding” IJERT, Vol. 8 Issue 10, October 2019

Downloads

Published

2024-08-01

Issue

Section

CJET Volume 3 Issue 1

Most read articles by the same author(s)

Similar Articles

31-33 of 33

You may also start an advanced similarity search for this article.